512-451-0070
skip to the main content area of this page
Installation Step 3: Starter Strip
Collapse ShinglesInstallation
Starter Strip

Starter strip is the next product installed on the roof. Any outside edge of your roof needs a row of starter strip. These ‘half shingles’ have a tar strip located 1” off the edge of the shingle and provide a tight seal for the first row of field shingles.


Set Up Your Free Inspection Today!